Frontiers of Data and Computing ›› 2022, Vol. 4 ›› Issue (5): 42-49.

CSTR: 32002.14.jfdc.CN10-1649/TP.2022.05.005

doi: 10.11871/jfdc.issn.2096-742X.2022.05.005

• Special Issue: East-to-West Computing Requirement Transfer: A Century Project to Start the Era of Computility Economy • Previous Articles     Next Articles

The Impact of “East-West Computing Requirement Transfer” on Meteorological Industry

ZHOU Yong1,GUO Zhuanzhuan1,*(),ZENG Qin2,HAO Yiyi1   

  1. 1. CMA Institute for Development and Programme Design, Beijing 100000, China
    2. Forecasting and Networking Department of CMA, Beijing 100000, China
  • Received:2022-07-18 Online:2022-10-20 Published:2022-10-27
  • Contact: GUO Zhuanzhuan E-mail:guozhuanzhuan820859@cma.cn

Abstract:

[Objective] The meteorological industry will be deeply influenced by the orderly promotion of the national major project of “East-West Computing Requirement Transfer”. It is essential to study the specific impact and countermeasures to make the meteorological industry better adapt to the policy requirements of “East-West Computing Requirement Transfer” and realize high-quality development faster. [Methods] Analyze the general situation and strategic significance of “East-West Computing Requirement Transfer” project, and deeply analyze the specific impact of the project on the high-quality development of meteorological undertakings. [Results] The project of “East-West Computing Re-quirement Transfer” not only regulates the construction of meteorological information systems, but also affects the geographical layout of the meteorological data centers, supercomputing centers, and national meteorological business, and requires further improving of the key performance indicators of meteorological information system. [Conclusions] Given the meteorological industry’s better adaptation to the relevant requirements of the “East-West Computing Requirement Transfer” project, this paper puts forward several suggestions and measures in four aspects: adjusting the construction ideas and methods of meteorological information network system, optimizing the layout of meteorological data centers and supercomputing centers, planning the adaptive adjustment to national meteorological operations, and carrying out climate ecological benefit assessment.

Key words: East-West Computing Requirement Transfer, meteorological industry, information system, data center